内页Banner
Services

In terms of products, Rister firmly believes that thoughtful service is as important as product technological innovation services. The company's leading products will cooperate with leading services. Rister will provide more standard professional operation mode to serve customers. Purchase, technical documentation, maintenance consultation, complaint, delivery, you only need an instruction. Today, you buy Rister quality; in this kind of life, you are a guest!


Pre-sales service: 

RISTER Group Co., Ltd. must do a good job in the selection and quotation of products; provide samples of products ordered by the buyer, including product introduction, performance parameters, installation dimensions, installation, commissioning and matters needing attention; and provide other technical materials required by the buyer.

After-sales service: 

A.The contract products shall be provided on time, quality and quantity, and the service such as quality insurance in transit shall be undertaken by the supplier.

B.Equipment warranty period: the product quality assurance period is based on the qualified time of equipment installation and commissioning, and the warranty period is 12 months. during the warranty period, all the quality accidents caused by the equipment itself shall be borne by the seller. if the failure caused by misoperation or improper use by the user, the seller will give support to the spare parts and only charge the cost of the parts to be replaced.

C.If there are any problems in the on-site installation process after the product arrives, the supplier will formulate the installation plan according to the specific conditions of the user within 2 hours after receiving the notice, and guide the user to install and connect the equipment correctly.

D.The supplier provides round-the-clock service.

 

In strict accordance with the ISO9001:2000 quality system operation, in line with CE certification.

1. Ensure that the key parts and main parts of chemical equipment are all new original products of our company.

2. Ensure that the materials of chemical equipment meet the requirements of relevant international standards.

3. Ensure that each part has been inspected more than twice in the processing engineering, and carry out the simulation performance test for the pressure-bearing parts.

4. All chemical equipment are tested for 100% ex-factory performance.

leave a message

leave a message
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.

Home

Products

Skype

WhatsApp